About Us

HomeAbout Us

Video poster

Neru

Formwork Systems

Neru was founded in 1985 with the aim to provide the highest quality, advanced formwork systems produced and manufactured locally to service the needs of developing modern construction practices.
m2

Covered Area

m2

Open Area

+

Years Experience

+

Employees

Neru Kalıp

Formwork System

1985.

Neru Formwork Systems was established in Ostim/Ankara for the purpose of manufacturing Industrial Formwork Systems.

1988

Tunnel Formwork System Production was started.

1990

In addition to the production of industrial formwork systems and tunnel formwork systems, the production of scaffolding systems was started and the product range was expanded and offered to our customers.

1991

Neru Formwork Systems has moved to our factory in Gölbaşı-Ankara, which has 10.000 m2 closed and 12.000 m2 open production area.

1992

Entering the foreign market was started with the export to Russian Federation.

1999

After the devastating earthquake in the Kocaeli-Sakarya-Düzce Region in 1999, Neru Tunnel Formwork Systems took its place in the reconstruction phase of this region and offered its products and solutions to the contractor in the reconstruction of thousands of houses. Neru has an important role in the reconstruction of our regions deeply affected by the earthquake in all corners of our country.

2003

Neru Formwork Systems started exporting to Asia, Europe and North African continents. Our agencies in Algeria, Iran, India and Mongolia have been put into service. bayiliklerimiz hizmete girmiştir.

2007

Neru Formwork Systems has made innovations in conventional systems and tunnel formwork by accelerating R & D activities according to industrial formwork needs in the world. Folding Well System in the tunnel formwork system; The Hydraulic Slip Formwork System in conventional…

2008

Neru Formwork Systems have started to use the technological robot system in the process production at the facilities with a closed area of 10,000 m2 within 12,000 m2 open area. The needs of all kinds of superstructure or infrastructure projects have been fulfilled with the high-qualified product range developed by Neru Formwork Systems.

2010

Neru Tunnel Formwork System is preferred in the construction of 30.000 housing projects built in Venezuela-Caracas. After the succes in Venezuela, Neru Tunnel Formwork Systems were preferred in the construction of thousands of housing projects in Brazil, the largest country in South America.

2013

Neru Hydraulic Slip Formwork System was preferred in the construction of Biogas Power Plant in Frankfurt/GERMANY

2014

Neru Formwork Systems were and still are preferred for projects carried out in Algeria, Libya, Morocco, India, Sri Lanka, Russian Federation, Turkic Republics, Mongolia, Iraq and Iran.

2022

Neru Formwork Systems has contributed to the completion of the construction of approximately 4 Million Houses in 35 years. Neru Formwork Systems, preferred in 5 Continent and over 35 Countries, has become one of the leading companies in its sector worldwide. Neru Formwork Systems has taken its unwavering place among its competitors in the world with the solutions for the needs of the projects and its wide product range.

Neru Formwork System

Our Certificates