MOULD SCAFFOLDS


 
In the buildings, the horizontal bearing members are the factors that trouble the workers regarding the mould, as much as do the vertical bearing members. Especially today the demand for the rapid production, the wish to prepare smooth and faultless surfaces and the need to be able to cast the substantial loads even at very high elevations have caused NERU MOULD SCAFFOLD SYSTEMS to become popular in the sector. The system is comprised of vertical elements and the horizontal elements that prevent the strain of these vertical elements. These elements are connected to each other by means of the CUPLOCK SYSTEM, which is a non-wedged and very safe connection system.

Pipes are the specifically produced pipes resistant to pressure. The system begins with the element we call the lower adjusting screw which contacts the ground, and the posts sit on this. The post length may vary, but they are generally 3mt ,2mt, 1mt and the lengths with half a meter. Horizontal connections have also numerous sizes, and it is possible to produce horizontal connections with special size based on the project. According to the status of the mould used on the topmost level, an upper member is placed on the posts based on the wooden U or NERU MOULD SYSTEM WITH VERTICAL HEAD, if any, or any other formwork of slab. Based on the status of the loads or in cases as necessitated by the project, system is reinforced by the diagonal connections.

ADVANTAGES OF THE SYSTEM

NERU MOULD SCAFFOLD SYSTEM possesses some superiority which is not found in any other mould scaffold system. Assembly and dismantling are very easy, and prevent the losses of workmanship. Since the system is made of the posts and the horizontal connections, there are almost no faults in the assembly. As the intermediate connection lengths are produced as fabrication and they have predetermined lengths, correct application of the first post enables the entire system to be installed correctly.

That the system is already designed and produced with the consideration of the individual and mobile loads eliminates the need to perform a scaffold calculation in the work site. Owing to the adjusting screws available both in the lower and upper sections, the system may be very precisely adjusted to any elevation. Since our company adopts the practice of painting each post or horizontal connection element with a different length in a different color, it is possible to perform the assembly in the work site without needing to check the measurements. The scaffold material whose duty has been complete may be stowed in a very orderly manner and thus preserved for use in another work.