NERU WORKING
SCAFFOLD SYSTEM is a system which may be
used in the stand production or shelf production
for storage, for the purpose of providing a
comfortable and safe working environment on
the high elevations during the operations of
wall construction, interior and exterior plastering,
side painting, the construction and maintenance
of silo and ship, and construction and maintenance
works for the dams, tunnels and high curtain
walls and also for other miscellaneous purposes.
Our company has two kinds of working scaffold
systems as our standard production. Our company
presents its users perfect solutions in the
form of a wedged and non-wedged system.
THE ELEMENTS THAT CONSTITUTE THE SYSTEM :
Posts: These, as their name implies,
are the vertical bearing elements of the system.
They have standard pieces at every half a meter
starting from a length of 0.5 m up to 3.0 m
so that they may be erected easily at any height.
Intermediate support: Being
either wedged or non-wedged, these elements
(there is no-loss wedge system for the wedged
version) form the horizontal connections. They
are produced with standard lengths of 0.7 m,
1.0m, 1.50m , 2.0m, 2.5m, 3.0m.
-Diagonal: These are the diagonal connection
elements that prevent the horizontal bending
in the multi-storey scaffold systems.
Lower Adjusting Screw:
It is the adjusting mechanism to set the scaffold
to a certain elevation on the irregular or not
orderly surfaces. The operating height of the
screw is 0.5 m.
Metal Scaffold Beam: These
are the working platform elements made of extended
steel sheet iron or perforated sheet iron which
provide a safe working ambience at the height
being worked or at any elevation as needed.
Metal Scaffold Ladder:
The ladder which provides a safe way of climbing
up and down between the different working elevations
of the scaffold.
In addition to those mentioned
above, there are miscellaneous intermediate
elements used in the system, such as the beginning
base and the building support.
The assembly of NERU WORKING
SCAFFOLD SYSTEM is a rather easy and fast
operation. A team of only a few members may
set up an area of around 1000 m2
within 1 day.