CUPLOCK SCAFOLDING DROP HEAD SLAB FORMWORK


NERU's drop head slab system is the result of years of R&D and attention to detail Our drop head system is combined  to great effect with our cuplock system to result in an industry changing formwork system.
 


The drop head system in combination with H20 beams results a simple and quick slab formwork assembly. With the known benefits of drop head systems the slab can be struck within two days of pouring. Due to this feature the investment required in total formwork can be greatly reduced. Also with the purchase of a little extra cuplock scaffolding the greater slab speeds can be achieved.
 
 
Copyright (c) 2014 Neru Co. Ltd. / Designed by Kayra.Net